{.sAewh[w#Iv#W6f" $JOPf/W%%XKK&A~b ?nfY_iu"m]HDwP) Rp Contract Cost Data Project Details. >> This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28
1}9AQ #T6Bc*)_vU"]T hY# C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. At TenCate ourgoal is your success. If the rock contains an excess of fines or inadequate voids, the desired results may be impossible to obtain. or call 5. (One call ordering and delivery). Review the plans for the location and number of weep holes. Other Names Rock Slope Protection. The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. For measuring concrete or shotcrete, refer to Sections 4-90, Concrete, or 4-53, Shotcrete, of this manual. /Type/ExtGState 0000000871 00000 n
KEwAx{N*$J
}COpU?s{bs. << Consult engineer to ensure applicable design requirements are met. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Note any changes that may have occurred between the preliminary design studies and the start of construction. Use all suitable material in the work. +NXR!ft]l|\P2. Angular shaped rock may be used on any planned slope. A geotextile is typically defined as any permeable textile material used to increase soil stability, provide erosion control or aid in drainage. Caltrans requires the use of these new RSP gradations starting August 1st, 2016 in new projects and those not yet at 30 percent PS&E stage. If your 20'x10' patio is to have a 6" base, then you should excavate a total area of 21' (20' +6" +6") by 11' (10' +6" +6"). The chart below lists US Fabrics' geosynthetics meeting CALTRANS specifications. Soil Stabilization Matting - Channel Application, Perm. 0000012468 00000 n
endobj The Maryland General Assemblys Office of Legislative Audits operates a toll-free fraud hotline to receive allegations of fraud and/or abuse of State government resources. Inspect the rock to ensure it has been cleaned of any adhering dirt and clay and is moistened before concrete placement. conforming to the requirements of 710-03 Vinyl Coated Steel Fence Fabric, Class A Wire Diameter, except color. (see Riprap Slope Protection Worksheet). This work consists of protecting slopes, channels, and gutters with riprap, interlock precast concrete blocks, concrete, grouted items, tied concrete block mats, crushed aggregate, or rock items. The color shall be black unless otherwise specified in the contract documents. The plans indicate the minimum depths of foundations. Vegetation (see . Civil engineers and landscape architects need proven solutions to control soil erosion, stabilize slopes, enable drainage and create a visually pleasing landscape. HToL[U?Ayb:V;%Y48{RMLIlq&+J[mNN?J;A? When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. Technical Support available for assistance. Class 2 is the default Class for M288 applications. 1. Order corrective work when necessary. >> endobj This article studies the mechanical properties and stability of CC slope protection by comparing it with conventional material (shotcrete). Place a layer (six inch minimum) of <> (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. Observe closely during rock placement to detect any damage to the fabric. Copyright 2023 TenCate Geosynthetics Americas. . Otherwise, placement could result in what is known as rockers or unstable rocks. For Type R, F, or Common stone riprap, provide Type 2 filter fabric when shown on the plans. Please enable scripts and reload this page. US 160NW is a nonwoven needlepunched geotextile made of 100% polypropylene staple filaments. Before placement of the broken concrete, inspect the material and be sure the reinforcement has been removed flush to the surface of concrete. If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. They blanket the soil, protecting it from wind and water forces. endobj Verify the types of measurements and records necessary to support payment for the work. Smooth the graded foundation. US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. Geosynthetic Bond Breaker (Call for product. NTPEP Datamine Information: RG80NC is a tracking model number for the following manufacturers products: Mirafi 180NC, SKAPS GE180/GT180C or Propex 861. Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. Enter the item description of the code you wish to search for: 0000008331 00000 n
Draw Down Device, Sediment Basin Schematic - Vert. Erosion control devices provide direct protection to the soil surface therefore, are considered one the best measures for preventing erosion. /OPM 1 XYo[unHCih,(~
t@K{
y.EmvKhy?_\F6.nO?iV5FlD,#t~J7z@Al.z_ooA=H
/$Q-Aav. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. endobj When placing rocks, the contractor should ensure each placed rock is stable and not dependent on the one on top to hold it in place. item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 3. 5 0 obj When specified, ensure coloring is added to the concrete. If extensive slope protection problems are anticipated or encountered during construction, refer these to the design engineer and the project manager, who may in turn obtain the advice of the Caltrans Bank and Shore Protection Committee.. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. Please enable JavaScript in your browser. Testing must follow the frequencies shown in Section 6-1, Sample Types and Frequencies, of this manual. engineering fabric pinned to the slope, or both a . Draw Down Device, Temporary Access Bridge (1 of 2, PDF only), Temporary Access Bridge(2 of 2, PDF only), Temporary Access Culvert (1 of 2, PDF only), Temporary Access Culvert (2 of 2, PDF only), Onsite Concrete Washout Structure (1 of 2, PDF only), Onsite Concrete Washout Structure (2 of 2, PDF only), If you are experiencing difficulty accessing these details or if there are anyquestions, please contact the Sediment, Stormwater & Dam Safety Program at (410) 537-3543 or by email (Amanda.Malcolm@maryland.gov, National Human Trafficking Hotline - 24/7 Confidential. If you have any questions about the consistency of the gabions, you may also order the unit weight to be verified during the course of the work. <>/Font<>>>/Fields[]>> When slope protection is paid by volume, review the plans and quantity calculations in the resident engineers file to determine if there is sufficient detail and accuracy to be used in the project records. B. Cables. Test panels may be specified in the special provisions. Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. | Conditions of Use | Privacy Policy AASHTO is typical mass of 4.1 sy/oz. The concreted-rock slope protection method is used where large rock is not economically available in large quantities, yet a heavy, service type of protection is required. 99 (30% off) Best Selling Saucony Flat Mask By mrhzid $8. Barrier Landscape Edging & Paver Edging 6'/8. 2019-07-30T13:47:33-04:00 TAR_%R5Wa%*x4ux-x5d1c
iU:v9b!KXGcFK 1fN2 t K! 4-7203C Small-Rock Slope Protection The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. (You may enter part of the word or the whole phrase). Use 5 to 7 st endobj Ensure the timber spacers are of the required material and spaced as planned. The following common types of slope protection are covered in this section: Other protective devices are used in conjunction with highway construction, and when used, they are included in the contracts special provisions. The finish surface must be roughened by brushing to expose rocks. For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. Transportation Specifications Section 96-1.02I for Rock Slope Protection Fabric, Class 8, nonwoven geotextile. US Fabrics is proud to serve the geotextile needs of the State of Califronia, including: Los Angeles, San Diego, San Jose, San Francisco, Fresno, Sacramento, Long Beach, Oakland, Bakersfield, Anaheim, Santa Ana, Riverside, Stockton, Chula Vista, Fremont, Irvine, San Bernardino, Modesto, Oxnard, Fontana, Moreno Valley, Glendale, Huntington Beach, Santa Clarita, Garden Grove, Santa Rosa, Oceanside, Rancho Cucamonga, Ontario, Lancaster, Elk Grove, Palmdale, Corona, Salinas, Pomona, Torrance, Hayward, Escondido, Sunnyvale, Pasadena, Fullerton, Orange, Thousand Oaks, Visalia, Simi Valley, Concord, Roseville, Santa Clara, Vallejo, Victorville, El Monte, Berkeley, Downey, Costa Mesa, Inglewood, Ventura, West Covina, Norwalk, Carlsbad, Fairfield, Richmond, Murrieta, Burbank, Antioch, Daly City, Temecul and all other areas of California. For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. If excess concrete remains on the surface, the finished product, when used in streams, will be too smooth and, along the protection, velocities will increase beyond those intended during design. Fabric must be RSP fabric that complies with the class shown in the following table: Rock must be cobble, gravel, crushed gravel, crushed rock, or any combination of these. uuid:bc193511-b4f2-4d99-b47d-5ec173dc2f21 3, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. > When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. Slope Protection consists of rock, concrete, or concreted rock or slope paving, ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE, THE PLACEMENT METHODS DESIGNATED BY CALTRANS, ADVANTAGES OF USING RIP RAP OR STONE PROTECTION FROM WILSON QUARRY (AROMAS), Make certain of the Product RequiredProject Service Requirements, Specifying Agency (Caltrans, Green Book, Army Corp or Other), Special Provisions addressing additional specifications, Certification Required (Submittals) Caltrans, Army Corps, other agency or engineer, Quantity Required (Specific GravityConversion Tons to Cubic Yards), Product Availability (Available when required, can handle Daily Shipping Requirements), The Reputation of your Supplier and their Products & Services, 100% Crushed Granite (Provides Superior Stability and Durability), Many different Rip Rap types available:All Caltrans Classes and Sizes, High Daily Production and Shipping Capacity (Can Handle Large & Small Jobs), Graniterock can provide delivery to your jobsite if desired. Neoloy Tough-Cells in slopes prevent erosion, enable drainage and stabilize the slope to provide a green surface cover. Provide filter fabric in accordance with DMS-6200, Filter Fabric. For protection stone riprap, provide Type 2 filter fabric unless otherwise shown on the plans. 7 0 obj The bid item list and plans will specify which type of slope protection is to be performed. Proven Product Track Record (Aggregate is widely accepted and approved)Wilson Quarry Products are recognized as the Industry Standard in the Monterey Bay Area, Product meets and is Certified for Army Corp Projects. 2 0 obj This translates to a 0.75H: 1V incline and is shown below. endobj Maximum slope 1.5:1 horiz:vert, (67% or 34) or flatter, and is limited to slopes < 30' of uninterrupted length. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO.